Saturday, June 11, 2011

6-10-11
Ned started on the ramp Friday afternoon about 5 pm. He finished the ramp part that evening by about 7:30 pm.


He set the lumber on the edge of the ramp because that side was curling up a little.




6-11-11
Wilma gets a cherry donut hole at the water store. After wolfing down the rest of the hole, she came back for the crumb on my finger. I gave her half of my blueberry donut hole as well.
Ned finished the ramp today by getting the railings installed. It took him all morning. Longer than the rest of the ramp. He ended up screwing the end into the concrete to keep it flush as it was trying to curl up.


No comments: